ETZMetz-Nancy-Lorraine Airport
Goin, France
ICAOLFJLElev870 ft
The Verdict52/100Not broken, just… tired
Infrastructure is the weak link. The trajectory is flat — no improvement in sight.
Ranked #148 of 198 airportsBased on data from 2000–2026Operational30%83Above average Infrastructure15%38Struggling Sent. Velocity15%48Room for improvement What People Think
If ETZ were a stock, you'd be shorting it.
6.4Avg Rating / 10
34%Positive
★ 3.3on Google Maps (364 reviews)
Sentiment Trajectory (2016–2026)-2.03 over 11 years
Then: 6.8/5 (12 reviews)Now: 4.8/5 (10 reviews)
Positive34%
Neutral58%
Negative9%
The Numbers
101KPassengers (2023)
+133.7%YoY Growth
101K passengers in 2023 — still 58% below the 2019 peak, though up 446% from the 2021 COVID crater.
91KInternational (90%)
10KDomestic (10%)
Passenger HistoryTardiness Report
2026/02–2025/03 · 1,875 flights0.2%Flights Delayed4 of 1,875 flights
0.0minAvg Delay
If punctuality were a religion, this airport would be the cathedral.
Delay Causes (ATFM)Weather0%
Carrier0%
ATC0%
Airport0%
The Runway Report
1 Runway04/228,202ft × 148ft · ASP · Lighted
The Backstory
AwardsNone recorded. A clean record — in the worst sense.