BIO

Bilbao Airport

Bilbao, Spain

Operated by Aena SME SAmixed
Opened1948ICAOLEBBElev138 ft
The Verdict
69/100Better than expected, honestly

Infrastructure is the weak link. At least the trend is improving.

Ranked #6 of 198 airportsBased on data from 2000–2026
Operational30%
84Reliably good
Sentiment25%
58Solidly average
Infrastructure15%
37Below par
Sent. Velocity15%
100Suspiciously good
Connectivity15%
59Passable

What People Think

BIO: where the highlight is the duty-free Toblerone.

6.7Avg Rating / 10
2,508
ReviewsGoogle 2506Skytrax 2
41%Positive
SKYTRAX STARS:★★★★
4.0on Google Maps (2,506 reviews)
Sentiment Trajectory (20242026)-0.71 over 3 years
Then: 9.1/5 (11 reviews)Now: 8.4/5 (220 reviews)
Positive41%
Neutral44%
Negative15%
Queuing
2.3
Cleanliness
2.1
Staff
1.9
Food & Bev
1.7
Wifi
2.4
Wayfinding
2.2
Transport
2.5
Shopping

The Numbers

7.1MPassengers (2025)
+4.2%YoY Growth

Record year! 7.1M passengers in 2025, up 20% from pre-pandemic levels and a staggering 322% rebound from the 2020 COVID low.

3.2MInternational (45%)
3.9MDomestic (55%)
54,468Aircraft Movements
Passenger History

Tardiness Report

2026/02–2025/03 · 96,860 flights
0.0%Flights Delayed37 of 96,860 flights
1.0minAvg Delay

Almost nothing is delayed. Either this airport is excellent or the data is lying.

Delay Causes (ATFM)
Weather34%
Carrier0%
ATC66%
Airport0%

Where You Can Escape To

Volotea·Base
Vueling·Base
71 routes · 4 regions
Europe10
Madrid Barajas International Airport (MAD)
Barcelona International Airport (BCN)
Amsterdam Airport Schiphol (AMS)
London Gatwick Airport (LGW)
Sevilla Airport (SVQ)
Munich International Airport (MUC)
Frankfurt am Main International Airport (FRA)
Charles de Gaulle International Airport (CDG)
Malaga Airport (AGP)
Valencia Airport (VLC)

Ground Transport

MMetro
RRail
TTram
BBus

The Runway Report

2 Runways
10/286,266ft × 148ft · ASP · Lighted
12/308,530ft × 148ft · ASP · Lighted

The Backstory

1948
Opened
HistoryIn 1996, a new taxiway with two rapid exits and a new aircraft parking apron were built. The works required the removal of tons of soil poisoned with lindane residues. In May 1999, the new tower control was put into service, which allowed for a more...
Awards

None recorded. A clean record — in the worst sense.